Place of Origin:
China
Brand Name:
SZAGS
Certification:
ISO9001, CE
Model Number:
HBW-50(F)
50hp Water-cooled Chiller: stainless steel water tank with coil evaporator, 165.6kW, for chemical cooling
This 50hp water - cooled chiller is a high - efficiency refrigeration equipment specially developed for the chemical industry. With a strong refrigerating capacity of 165.6kW, it can meet various cooling needs in chemical production. It adopts the high - quality configuration of a stainless steel water tank with a coil evaporator, ensuring stable operation in complex chemical environments and providing reliable temperature guarantee for the production process. The design of the equipment fully considers the particularity of the chemical industry, and from the selection of materials to the setting of performance parameters, it strives to match the harsh conditions of chemical production.
Application Fields
It is especially suitable for various cooling links in the chemical production process, such as cooling of chemical reaction kettles, which can effectively control the reaction temperature, ensure the full progress of chemical reactions and the quality of products; cooling of chemical raw materials can prevent raw materials from deteriorating or decomposing due to high temperature. Whether it is a small chemical experimental device or a large chemical production line, it can be flexibly adapted, providing strong support for the safe and efficient chemical production.
Features
1.High - quality Materials, Durable and Corrosion - resistant
The water tank is made of high - quality stainless steel, which has excellent corrosion resistance after special surface treatment. It can effectively resist various corrosive media such as acids and alkalis that may be encountered in chemical production, greatly extending the service life of the equipment. The coil evaporator is made of high - efficiency heat transfer materials, with an exquisite design. It not only has high heat exchange efficiency but also strong stability, which can maintain good refrigeration effect during long - term operation and ensure the continuous and stable operation of the refrigeration system.
2.Strong Refrigeration, Efficient and Reliable
With a high - power refrigerating capacity of 165.6kW, it can quickly reduce the temperature of the cooled medium, and can control the temperature within the precise range required for chemical production in a short time, meeting the strict requirements for low - temperature environments in chemical production. The unit adopts an advanced refrigeration cycle system, equipped with high - precision temperature sensors and control systems, which can automatically adjust the refrigerating capacity according to the change of load, maintain high - efficiency performance during long - term and high - intensity operation, and reduce the situation that the production progress is affected due to insufficient refrigeration of the equipment.
3.Safe and Stable, Ensuring Production
The equipment is equipped with multiple safety protection devices, such as high - pressure protection, low - pressure protection, overload protection, water flow switch protection, etc. When the equipment is in abnormal conditions, these protection devices can respond quickly, automatically cut off the power supply or issue an alarm, avoiding equipment damage and production accidents, and providing a strong guarantee for the safe progress of chemical production.
Technical Parameters:
Model Item |
HBW-50(F) | |
nominal cooling capacity | kcal/h | 142416 |
kw | 165.6 | |
input power | kw | 37.4 |
power supply | 3PH~380V/50HZ(200V/220V/415V/460V~50Hz/60Hz) | |
refrigerant | type | R410A |
type of control | thermostatic expansion valve | |
compressor | type | hermetic scroll |
power(kw) | 33.4 | |
condenser | type | Shell and Tube |
cooling water flow(m3/h) | 34.3 | |
evaporator | type | water tank with coil |
chilled fluid flow(m3/h) | 28.6 | |
volume(L) | 720 | |
inlet and outlet pipe diameter (inch) | 3 | |
pump | power(kw) | 4 |
lift(m) | 22 | |
safety protection | compressor over temperature, over current, high and low pressure, over temperature,flow switch, phase sequence, phase-missing, exhaust overheating, anti-freezing | |
weight | kg | 1500 |
dimension | mm | 2250*1100*1980 |
Convenient Maintenance
The structure design of the equipment is convenient for maintenance. The installation position of key components is reasonable, and it is easy to disassemble and replace. At the same time, the equipment is equipped with a perfect fault diagnosis system, which can timely find faults in the operation of the equipment and prompt the fault location and cause, greatly shortening the maintenance time, reducing maintenance costs, and improving the utilization rate of the equipment.
FAQ
1.How long is the leading time of chillers?
Our leading time is usually 10-30 days, depending on the quantity of order, product model and custom requirements.
If you have urgent needs, please communicate with the sales staff when placing an order, we will do our best to provide you with expedited service.
2.How is the quality of the chillers guaranteed?
All of our industrial chillers go through strict quality control and testing to ensure that each machine leaves the factory in compliance with international quality standards. We use high-quality materials and advanced production processes to ensure the reliability and durability of our equipment. In addition, every machine is thoroughly tested before leaving the factory to ensure its performance and quality.
3.How long is the warranty period for the chillers?
Our industrial chillers usually come with a 1-year warranty. During the warranty period, any failure caused by quality problems, we will provide free repair and replacement services
Send your inquiry directly to us