2026-06-09
BINH DUONG, Vietnam \u2013 A mid-sized injection molding factory in the VSIP II industrial park has reported significant cost savings and quality improvements after replacing its aging water-cooled chiller and cooling tower system with the HBC-10(D) 10-ton packaged industrial water chiller from AGS Chiller.
\n\nThe factory operates 8 injection molding machines producing plastic components for electronics and home appliances. The existing cooling system relied on a water-cooled chiller paired with an external cooling tower, a setup that had accumulated years of problems:
\n\n\"Every time the chiller tripped, we lost 2 to 3 hours of output,\" said the factory's production manager. \"With the tight delivery schedules our buyers demand, that was becoming unacceptable.\"
\n\nAGS Chiller recommended the HBC-10(D) 10-ton (30.5kW) packaged industrial water chiller. The unit arrived as a complete system with built-in 200L water tank and 1.5kW circulation pump, requiring no cooling tower, no additional piping, and no water treatment setup. Installation was completed in one day.
\n\nAfter three months of continuous operation, the factory documented the following improvements:
\n\n| Metric | Before (Old System) | After (HBC-10(D)) | Improvement |
|---|---|---|---|
| Scrap Rate | 8.0% | 5.2% | -35% |
| Average Cycle Time | 28 seconds | 22.5 seconds | -20% |
| Monthly Downtime | 12 hours | 1.5 hours | -87% |
| Maintenance Cost/Month | $450 | $80 | -82% |
| Daily Output | 24,600 shots | 30,700 shots | +25% |
The elimination of cooling tower maintenance alone saved approximately $4,400 per year. Combined with the scrap rate reduction and increased output, the factory recovered the full cost of the HBC-10(D) within the first three months.
\n\n\"Before, we budgeted for chiller repairs like a recurring expense. Now we don't think about the chiller at all. It just runs,\" the production manager noted.
\n\nShell-and-tube evaporator. With bore well water that would destroy a plate heat exchanger within 3 years, the 8-to-12-year service life of the shell-and-tube design was a deciding factor.
\n\nAll-in-one packaged design. No cooling tower saved installation time, maintenance burden, and floor space.
\n\nCopeland scroll compressor. Local availability of replacement parts through Vietnam's supply chain meant no waiting for imports.
\n\nR410a compliance. The refrigerant aligns with Vietnam's HCFC Phase-Out Management Plan.